中文|English
Share to:
Land-based drilling rigs
Coiled tubing drilling rig ZJ15LG、ZJ20LG

Main body trailer, matched with portal mast and detachable crown block, equipped with coiled tubing unit and conventional drilling equipment;

Technical parameters

1. Capacity of reel: (1) 2 7/8in:3000m (9843ft), (2) 3 1/2in:2000m (6562ft),

2. Hoisting load of injection head: 534kN (120000lbs),  

3. Injection load of injection head: 267kN (6000lbs),

4. Lifting manipulator/reversing manipulator: (1) diameter of clamped pipe: 88.9-244.5mm (3 1/2-9 5/8in), (2) length of clamped pipe: 7-10m (23-33ft),

(3) Maximum load: 30kN (6744lbs),

5. Rated load of mast and substructure: 1350kN (300000lbs),

6. Clear height of mast: 18.5m (60.7ft),

7. Height of drill floor: 4.5m (14.8ft),  

8. Rated load/maximum torque/rated speed of power swivel: 135kN(300000lbs)/35kN.m(25806ft.lbs)/152rpm,  

9. Clamping range/makeup torque/breakout torque of iron roughneck: 88.9~244.5mm(3 1/2-9 5/8in)/81.9kN.m(60387ft.lbs)/108.5kN.m(80000ft.lbs),

10. Maximum power of composite HPU: 312kW(418HP);


+86 28-6817-6436

China's sichuan province jinniu district information garden east road no. 99

+86 28-8297-1793

COPYRIGHT? 2013 - HONGHUA. ALL RIGHTS RESERVED 澳门金沙6088.com有限企业版权所有 蜀ICP备12009856号-1
XML 地图 | Sitemap 地图